  • Written Nov 8, 2026 from 20 sources, including the 10-Q filed Nov 5, 2026.
  • Argued by a bear and a bull critic.

How dossiers are written

Moatsight viewPart 3 of 5 · 18 min read

Earnings

Loud claims, checked: 2 partly supported · 1 supported · 3 open
VerdictClaimWho and when
Partly supportedThe delay is documented in the 10-Q; how much of Microsoft's spending gap came from IREN is not shownDelays at IREN's Childress site led Microsoft to spend about $5 billion less on capex than planned in its September quarterIn What changedThe Information, November 4, 2026, citing unnamed sources
OpenThe filings neither confirm nor refute the customer accountsCustomers have had extended power outages, network disruption and storage failures at the British Columbia sitesIn What changedSemiAnalysis, October 2026
Partly supportedGrowth is paced by funding; the contracted programme is funded on the company's figuresTighter credit will force most GPU clouds into failure or consolidationIn What changedElon Musk, post on X, October 25, 2026
SupportedFor the data centers only; IREN has $10.0 billion of debt principalIREN's data centers were paid for in cash and carry no debtIn What changedCo-CEO Daniel Roberts, November 5, 2026 earnings call
OpenIREN was not named; its five-year life has held so far in a tight marketAI chips earn for two to three years, so five- and six-year depreciation lives overstate profitsIn What changedMichael Burry, about large cloud companies, as reported by CNBC on November 14, 2025
OpenWhether a pause reaches approvals already granted is not knownA new Texas governor will pause data center approvalsIn What changedGovernor-elect Gina Hinojosa, as reported by The Texas Tribune on November 4, 2026

A verdict is the Moatsight view of what the filings show, not a finding of fact.

The core

The first quarter of fiscal 2027 (July to September 2026) was the first in which IREN looked like an AI cloud rather than a miner: AI Cloud revenue rose from $71 million to $200 million in a quarter as Horizon 1 started billing Microsoft, at an 86% segment gross margin. The headline hides how far the business still is from paying for itself. Operating cash flow of $529 million was less than the $645 million of customer prepayments received in the quarter; without them it was negative. Capital spending of $4.8 billion made free cash flow minus $4.3 billion, net debt rose from $0.2 billion to $4.4 billion in three months, and stock-based pay ($106 million) was larger than adjusted EBITDA ($66 million). The one cost guide was beaten, but the dated milestones that drive revenue have slipped: Horizon 1 arrived about seven and a half months after its first target, and the more than $4 billion ARR target has moved from December 2026 to January, possibly February, 2027.

The quarter in one table

Metric, USD millionQ1 FY27Q1 FY26Change on a yearQ4 FY26Against guidance
AI Cloud revenue2007.3about 27 times71no revenue guidance
Bitcoin Mining revenue28233.0−88.0%67no guidance; being wound down
Total revenue228240.3−5.1%137no guidance
Net income (loss)−263384.6n/a−684no guidance
Diluted EPS, USD per share−0.661.08n/an/ano guidance
Adjusted EBITDA (company measure)6691.7−28.0%19no guidance
Cash operating expense11866.0n/a85rise of 33 against a guided 40 to 50: Beat
Source: Earnings releases of November 5, 2026 and February 5, 2026; Form 10-Q for the quarter ended September 30, 2026; Moatsight calculations.

The year-ago profit is not a comparison: $665 million of it was an unrealised gain on financial instruments, and the quarter also carried a $190.7 million tax charge (earnings release of February 5, 2026). IREN gives no revenue or earnings guidance, so the quarter can be held only against its operating targets (see the track record below). The Q4 FY26 diluted EPS is shown as n/a because the company files no stand-alone figure for that quarter.

Compared with the June quarter, AI Cloud revenue rose 182%, as the company states from the rounded $71 million (184% from the unrounded $70.5 million). Of the $200 million, $65 million was lease revenue from Microsoft, which began on acceptance of Horizon 1 in August; the rest was service revenue, mostly from British Columbia and the first customers at Childress. Bitcoin Mining fell by more than half again as machines were switched off.

Five quarters of the AI Cloud ramp

QuarterAI Cloud revenue, USD millionAI Cloud gross margin before D&AAdjusted EBITDA, USD millionStock-based pay, USD millionD&A, USD millionNet income, USD million
Q1 FY267.390.4%91.772.485.2384.6
Q2 FY2617.386.1%75.358.299.2−155.4
Q3 FY2633.686.3%59.531.5121.2−247.8
Q4 FY2670.587.0%19.242.9112.1−684.0
Q1 FY2720086.0%66106148−263
Source: Earnings releases of February 5, May 7, August 27 and November 5, 2026; Form 10-Q for the quarter ended September 30, 2026; Moatsight calculations of margins.

The segment margin is steady: on each added dollar of AI Cloud revenue, the extra gross profit was 83.0%, 86.5%, 87.5% and 85.5% in the last four quarters (we calculate). That is the margin of the computers once they are running. Everything below it is heavier: depreciation, which will rise as Horizons 2 to 4 and Mackenzie go into service; corporate costs, which management guided up again; and interest.

Cash: the quarter's real story

QuarterOperating cash flow, USD millionof which prepayments (deferred revenue), USD millionCapital spending, all PP&E, USD millionFree cash flow, USD million
Q1 FY26142.422.5280.6−138.2
Q2 FY2671.623.3719.1−647.5
Q3 FY2675.373.81,355.3−1,280.0
Q4 FY261,811.11,722.21,978.2−167.1
Q1 FY275296454,824−4,295
Source: Earnings releases of February 5, May 7, August 27 and November 5, 2026; Moatsight calculations. Capital spending is "payments for property, plant and equipment net of computer hardware" plus "payments for computer hardware".

How to read this: IREN's cash flow statement splits capital spending into two lines, and the GPUs are in the second one, "payments for computer hardware" ($2,693 million in the quarter). A free cash flow that subtracts only the first line ($2,131 million) leaves out the computers the business rents. We subtract both. On that basis free cash flow over the twelve months to September 30, 2026 was minus $6,389.6 million, on operating cash flow of $2,487.0 million and capital spending of $8,876.6 million.

Two things stand out. First, nearly all of the twelve months' operating cash flow ($2,464.3 million of $2,487.0 million) was customer prepayments: Microsoft's 20% advance and the deposits of other customers. That cash is real, but it is revenue received in advance; it will show up as revenue without cash in later years (Microsoft's is credited against fees after month 24). In the September quarter, operating cash flow without the prepayment inflow was minus $116 million. Second, the quarter's spending was $4.8 billion, and the company plans about $15 billion more by June 30, 2027 (earnings release of November 5, 2026).

The funding of that spending changed the balance sheet in one quarter:

Item, USD millionJune 30, 2026September 30, 2026
Cash and cash equivalents5,8963,522
Restricted cash1,7242,256
Debt including finance leases7,83610,208
Net debt (company measure)2164,430
Deferred revenue (prepayments received)1,8432,544
Capital commitments13,81018,947
Source: Earnings release of November 5, 2026; Form 10-Q for the quarter ended September 30, 2026; Form 10-K for the year ended June 30, 2026.

Of the restricted cash, $1,050 million was proceeds of the Microsoft-linked notes held in escrow until delivery milestones are met; the rest sits in reserve accounts under debt and letter-of-credit arrangements (10-Q). Of the $10,041 million of debt principal, $6,746 million is convertible notes with coupons of 0% to 3.5% that mature from 2029 to 2033, and $3,295 million is GPU financing and other debt. The Microsoft-linked GPU loans ($1,980 million) are non-recourse to IREN except for limited guarantees and carry effective rates of 7.09% to 7.22%; the newer GPU Financing 2.0 and 3.0 ($1,302 million) are guaranteed by IREN and carry effective rates of 10.70% and 10.38% (10-Q, Note 19). Finance expense was $73 million in the quarter against $9.3 million a year earlier, cushioned by $51 million of interest income on cash that is now being spent.

What the headline hides

  • Stock-based pay. At $106 million, stock-based pay was 46.5% of revenue. Adjusted EBITDA excludes it; adjusted EBITDA less stock-based pay was minus $40 million. Part of the jump is the July 1, 2026 grants of 9,099,328 restricted share units to each co-CEO, valued at $276 million each and vesting over four years (10-Q).
  • ARR against revenue. Operating ARR of $1 billion at September 30 compares with AI Cloud revenue that annualises to $800 million. The CFO said on the November 5 call that a quarter of the $1 billion would be recognised in the December quarter and that new Horizon and Mackenzie capacity would add little revenue before late December or early 2027.
  • Receivables. Accounts receivable rose from $21 million to $192 million in the quarter, nearly all of a quarter's AI Cloud billing (10-Q). Part of the jump is timing at the start of the Microsoft lease; if it persists, the cash conversion of the new revenue is slower than the income statement suggests.
  • Concentration. Three customers made up 28%, 24% and 18% of revenue, 70% between them; none was above 10% a year earlier (10-Q, Note 4).
  • Dilution. Shares outstanding rose 43.8% in a year, from 282.9 million at September 30, 2025 to 406.9 million, and reached 424.4 million on October 30, 2026 (we calculate from the 10-Q). A further 127.2 million shares sit behind the convertible notes, 30 million behind NVIDIA's rights and 31.7 million behind share units, all excluded from diluted EPS because of the loss; 40.2 million share units were outstanding in all, 9.6 million of them vested (10-Q).
  • One-off items, both ways. The quarter's loss included a $28 million unrealised loss on capped calls, a $21 million write-down of mining machines held for sale and an $8 million gain on disposals. The June quarter's loss of $684 million was mostly a $450.4 million impairment of mining hardware and displaced equipment.
  • Accounting labels. "AI Cloud Lease" is new this quarter and arises from how the Microsoft contract is accounted for; it is not a separate leasing business. Lease revenue is recognised evenly over the term, while $16 million of it depends on availability conditions.

Testing the drivers against history

Pricing against cost. On the August 27, 2026 call management said data center and GPU capex requirements would be up about 15% to 20% and that revenue increases would outpace them. The two figures available are not like for like. The November 5 release reports that contracted pricing rose 11% on three-year deals and 12% on five-year deals in a single quarter (contracts signed in the September quarter against those of the June quarter), while the 15% to 20% is the step in cost per megawatt for fiscal 2027 as a whole. On the August call management also said three-year contracts were above $20 million per megawatt with discussions near $25 million; in the September quarter they were signed at $19 million to $23 million, and five-year contracts at about $17 million (CFO, November 5 call). The contracts signed after the quarter (about $22 million on five years, with 90% of the GPU capex prepaid, and $40 million on a short-term deal, earnings release of November 5, 2026) are higher, but they are single contracts whose customers are not named. The evidence so far is that prices have held, not that they keep running ahead of costs.

Payback. Roberts said on the November 5 call that recent pricing supports GPU paybacks of "around 18 months or even lower". The payback counts the GPUs only. Including the data center, the CFO's own illustration gives about three years, and on our calculation (Business explainer tab) the whole investment earns its cost of capital only above about $15.8 million per megawatt a year before tax and overhead, or about $20.2 million after them if the GPUs are worth nothing after the first contract. With one more year of GPU use, as our Base scenario assumes, the line after costs is about $19.2 million, and a 90% prepayment lowers it further. Payback is the right test for funding risk; it is not a test of value.

The life of a GPU. IREN depreciates GPUs over five years (10-K). The evidence so far supports at least that: Kent Draper, the Chief Commercial Officer, said on the February 5, 2026 call that A100 and H100 chips, more than five and three years old, were still effectively fully used across the industry, and the November 5 release says older H100s at Prince George were recontracted at double their earlier price. That was in a tight market; the history of GPU rental prices is too short to show what happens to older chips when supply catches up.

The old driver. Until 2025, results tracked the bitcoin price and network hashrate. That business made $233 million of revenue a year ago and $28 million this quarter; from 2027 it will not matter.

What management said that is new

  • The ARR target moved. Co-CEO Daniel Roberts said on the November 5, 2026 call that the more than $4 billion of operating ARR, targeted in July for year-end, is now targeted for January, because "a customer asked for a design change, which we agreed to, and it sits outside the original scope" and because of supplier timing; if suppliers are late, "it may run to the end of February". In the question session he described the change as a Microsoft request to reconfigure and upgrade network infrastructure after the Horizon 1 hand-over, and called its extra cost "entirely immaterial".
  • Capex cut, targets kept. Spending for fiscal 2027, guided at $25 billion to $30 billion on the August 27 call, is now about $5 billion spent plus $15 billion planned. Roberts said on the November 5 call that the reason was "purely and simply financial markets in the current state" and that "we're not going to grow at all costs". The 0.8 GW target for the end of calendar 2027 was kept; no ARR target beyond the $4 billion was given.
  • Funding. The CFO said about $9 billion of the $15 billion is covered by cash, committed GPU loans and prepayments, and that "indicatively, $12 billion to $15 billion" of possible sources stands against the remaining $6 billion before convertibles or equity. Roberts said the data centers, $6 billion of assets today, were "cash funded to date and unencumbered", and that capital markets "have become more selective in the last few weeks".
  • Costs. The CFO guided cash operating expense up about $50 million to $60 million in the December quarter.

Management track record

Guidance against results

Beat = better than the guided range (above its top; for a cost, below its bottom); met = inside it; miss = worse than the range; a point is met within 1%. A dated milestone is met if reached within the quarter given, a miss if later, a beat if more than one quarter early. We score the first guidance given for each period and note later changes. IREN gives no revenue or profit guidance, so the rows are the operating, cost and capex targets it does give.

Guidance, scored

  1. Q2 FY25 (December 2024):Beat
  2. Q4 FY25 (June 2025):Met
  3. Q2 FY26 (December 2025):Miss
  4. Q4 FY26 (June 2026):Met · Sweetwater 1 substation energisation, date; Miss · First Microsoft revenue, date
  5. Q1 FY27:Beat
  6. Q2 FY27:Due
  7. FY 2027:Due
ScorePeriodMetricGuidanceActualNote
BeatQ2 FY25 (December 2024)Installed hashrate, EH/s3031Call only (first heard May 15, 2024; repeated August 28, 2024); 31 EH/s as stated on the February 12, 2025 call, no December 31 reading published
MetQ4 FY25 (June 2025)Installed hashrate, EH/s5050Call only (November 26, 2024), moved forward from the second half of 2025
MissQ2 FY26 (December 2025)Horizon 1 delivery, dateQ4 2025August 13, 2026Call only (February and May 2025); the design was enlarged for the Microsoft contract signed November 3, 2025
MetQ4 FY26 (June 2026)Sweetwater 1 substation energisation, dateApril 2026April 2026Energised on schedule, May 7, 2026 release; first given on the November 26, 2024 call
MissQ4 FY26 (June 2026)First Microsoft revenue, datecalendar Q2 2026August 2026Call only (February 5, 2026); revenue began on acceptance of Horizon 1 in August
BeatQ1 FY27Cash operating expense, increase on the quarter, USD million40 to 5033Guided as cash SG&A on the August 27, 2026 call; actual is SG&A and R&D less stock-based pay
DueQ2 FY27Cash operating expense, increase on the quarter, USD million50 to 60Guided on the November 5, 2026 call
DueQ2 FY27Operating ARR at December 31, 2026, USD billion3.4First given November 6, 2025; raised to 3.7 (May 7, 2026) and above 4 (July 20, 2026); moved to January 2027, possibly February (November 5, 2026 release)
DueQ2 FY27Horizons 2 to 4 delivery, dateDecember 2026 quarterAugust 27, 2026 release and call; a small delay expected (November 5, 2026 call)
DueQ2 FY27Bitcoin mining transition substantially complete, dateDecember 31, 202610-K; 10-Q adds immaterial mining through calendar 2027
DueFY 2027Capital spending, USD billion25 to 30Call only (August 27, 2026); November 5, 2026: about 5 spent and 15 remaining, about 20 in all

Source: IREN earnings calls of May 15, 2024, August 28, 2024, November 26, 2024, February 12, 2025, May 14, 2025, February 5, 2026, August 27, 2026 and November 5, 2026; earnings releases of November 6, 2025, May 7, 2026, August 27, 2026 and November 5, 2026; release of July 20, 2026; release of August 13, 2026; Form 10-K for the year ended June 30, 2026; Form 10-Q for the quarter ended September 30, 2026.

Of six scored rows, two are Beat, two Met and two Miss; five are Due. The record splits cleanly: targets IREN controls on its own (hashrate, a substation, its own costs) were met or beaten, while the two dated milestones that depend on a customer's design and on acceptance were late. One target has no row because no figure was published for its date: AI Cloud ARR above $500 million by the end of calendar Q1 2026 (November 6, 2025 release); the CFO said on the August 27, 2026 call that IREN exited June at roughly $0.5 billion. Earlier mining targets (20 EH/s by September 2024, Childress capacity by December 2024) have no published actuals and no rows; nor does the 2025 Horizon build cost per megawatt. We cannot reach back eight quarters of financial guidance because the company has given almost none. The guidance does not look sandbagged: where it can be scored on dates, it has been optimistic.

Promise register

StatusPromise, and what became of itFirst madeLater restatements
Met50 EH/s of installed mining capacity by June 30, 2025Reached; mining expansion was paused in May 2025 and the fleet is now being switched offNovember 26, 2024 call: expansion to 50 EH/s in the first half of 2025February 12, 2025 call: by mid-year; May 14, 2025 call: by June 30
MetEnergise the Sweetwater 1 substation in April 2026Energised on scheduleNovember 26, 2024 call: an April 2026 timelineNovember 6, 2025 release: April 2026; February 5, 2026: on track for the June quarter
SlippedDeliver Horizon 1 at Childress in Q4 2025Delivered to and accepted by Microsoft on August 13, 2026, about seven and a half months late, after the design was enlarged for the Microsoft contractFebruary 12, 2025 call: completion in the second half of 2025May 14 and August 28, 2025 calls: Q4 2025; May 7, 2026 call: hand-over in calendar Q3
SlippedAI Cloud ARR above $500 million by the end of calendar Q1 2026No March figure published; roughly $0.5 billion at June 30, 2026 (CFO, August 27, 2026 call)November 6, 2025 release: above $500 million by end of Q1 2026
LoweredOperating ARR target by December 31, 2026Level raised to above $4 billion, date moved to January 2027, possibly the end of FebruaryNovember 6, 2025 release: $3.4 billion by end of 2026May 7, 2026: $3.7 billion; July 20, 2026: above $4 billion; November 5, 2026: January 2027
LoweredHorizons 2 to 4 delivered to Microsoft in the December 2026 quarterA small delay from a Microsoft-requested network change; the 10-Q says dates are extended without delay credits, with fees and credits under discussionNovember 3, 2025 release: deployed in phases through 2026August 27, 2026: December quarter; November 5, 2026 call: January, potentially February
Raised140,000 GPUs by the end of 2026Raised to 150,000 GPUsNovember 6, 2025 call: up to 140,000 GPUs by end of 2026May 7, 2026 call: 150,000 GPUs and 480 MW
Open0.8 GW (IT) of data center capacity by the end of calendar 2027Kept on November 5, 2026 although fiscal 2027 capex was cutMay 7, 2026 release: 1,210 MW gross in build for 2027August 27, 2026 release: 0.8 GW (IT); November 5, 2026 release: 0.8 GW
OpenRamp the NVIDIA contract from early 2027The CFO said on November 5, 2026 that Childress air-cooled deployments are now spread across calendar 2027 rather than front-loadedMay 7, 2026 release: ramp from early 2027
On trackSubstantially complete the exit from bitcoin mining by December 31, 2026Installed mining capacity fell from 23.2 to 7.9 EH/s in the September quarterNovember 6, 2025 release: British Columbia transition by end of 202610-K: substantially complete by December 31, 2026; 10-Q: immaterial mining through 2027
On trackFund about 90% of GPU capex with GPU loans and customer prepaymentsCapacity behind the more than $4 billion ARR target fully funded; Mackenzie GPU capex more than 100% funded (November 5, 2026 call)February 5, 2026 release: Microsoft GPU financing with the prepayment covering 95%November 5, 2026 call: target of 90% including prepayments
DroppedPossible distribution to shareholders in calendar 2025Consideration deferred in February 2025; no dividend declaredNovember 26, 2024 call: potential investor distribution in calendar 2025February 12, 2025 call: consideration deferred
What the ten status words mean
Met
Done as promised, by the date given.
Exceeded
Done, and more than promised.
On track
Not due yet; the latest figures point to it.
Open
Not due yet, and the figures so far cannot settle it.
Slipped
Not done by the date given, and still pursued.
Lowered
Cut openly before its date; the new target is in "What became of it".
Raised
Lifted openly before its date; the new target is in "What became of it".
Quietly reframed
Changed without being called a change.
Dropped
No longer pursued or mentioned.
Missed
Due, and not delivered.

Source: IREN earnings calls of November 26, 2024, February 12, 2025, May 14, 2025, August 28, 2025, November 6, 2025, February 5, 2026, May 7, 2026, August 27, 2026 and November 5, 2026; IREN releases of November 3, 2025, November 6, 2025, February 5, 2026, May 7, 2026, July 20, 2026, August 13, 2026, August 27, 2026 and November 5, 2026; Form 10-K for the year ended June 30, 2026; Form 10-Q for the quarter ended September 30, 2026.

The register leaves out smaller promises (the NVIDIA "up to 5 GW" partnership, which is non-binding, and the Spanish pipeline, whose size the filings give as 300 MW against 490 MW in the May 2026 release).

When targets slipped

The two slips share a cause: the customer changed what it wanted. Horizon 1 was planned in early 2025 as a 75 MW liquid-cooled hall to be finished that year; the Microsoft contract of November 2025 turned Horizons 1 to 4 into four 50 MW deployments built to a hyperscaler's specification, and the hall was accepted in August 2026. The same customer then asked for a network change across all four Horizons, which moved the ARR target by one to two months. In both cases the contract, not IREN's construction, set the pace, and the 10-Q says dates move without delay credits for changes Microsoft requests.

Weighed against that, on November 6, 2025 Roberts said IREN had "never ever missed a construction or commissioning date in our life as a listed company". By the record above, that held for the mining build-out and the Sweetwater substation and has not held since IREN began building for a hyperscaler. Management addressed the latest slip in its opening remarks rather than in a footnote, which counts in its favour; what it has not explained is how the Microsoft discussions on fees and credits will end.

Capital allocation

  • Equity. IREN has funded itself heavily with shares. It sold 66.7 million shares for $1.0 billion at an average of about $15 in 2025, 39.7 million at $41.12 in a December 2025 placement, and 76.8 million for about $3.7 billion under its $6 billion at-the-market programme by October 30, 2026, about $48 a share on average (we calculate from the 10-Q). In the September quarter it sold 12.3 million shares for $541 million net, about $44 each; after September 30, 17.4 million for about $630 million gross, about $36 each. Against a share price near $21 in early November 2026, those sales were well timed for existing holders.
  • Convertible notes. $6.75 billion outstanding in six series, most with conversion prices of $51.40 to $85.63 and capped calls that raise the effective conversion price to $82.24 to $120.18. The two oldest series ($445 million, convertible at $13.64 and $16.81) are deep in the money. In December 2025 IREN bought back $544.3 million of those two series for about $1.63 billion in cash, paying a $111.8 million inducement.
  • Acquisitions. Mirantis (software, August 2026) for about $538 million, mostly 12.6 million shares, of which $414 million is goodwill; Nostrum Group (Spanish development sites, June 2026) for about $148 million.
  • No buybacks and no dividends. The two buyback resolutions on the November 24, 2026 meeting agenda only allow shares to be delivered under the existing prepaid forwards and capped calls (proxy statement of October 13, 2026).

Insiders

No officer or director bought or sold shares on the open market in the twelve months to October 2026; the Form 4 filings in that period are the July 1, 2026 grants. Before that, each co-CEO sold 1 million vested options to a broker at $23.51 to $25.49 on September 3 and 4, 2025, and 1 million shares at $33.13 on September 11, 2025 (Form 4 filings). Each co-CEO beneficially owns 13.2 million shares, counting options and share units that vest within 60 days (proxy statement of October 13, 2026). Their July 2026 grants are time-based, not tied to performance, and the proxy says no further equity grants are planned until fiscal 2031.

How far management's word can be trusted

On money, IREN's management has done what it said: it raised what it said it would, kept GPU financing near the 90% it targets, met its cost guidance and moved quickly to cut the capex plan when credit markets tightened. On dates, its record since it started building for a hyperscaler is two quarters late on the first hall and one to two months late on the rest, each time with a customer change as the stated reason. The fair reading is that funding commitments can be taken close to face value and delivery dates should be read with a quarter's margin.

Sources

  1. Earnings release for the quarter ended September 30, 2026 (Form 8-K, exhibit 99.1)IREN LimitedNov 5, 2026
  2. Form 10-Q for the quarter ended September 30, 2026IREN LimitedNov 5, 2026
  3. Form 10-K for the year ended June 30, 2026IREN LimitedAug 27, 2026
  4. Earnings release for fiscal 2026 (Form 8-K, exhibit 99.1)IREN LimitedAug 27, 2026
  5. Earnings release for the quarter ended March 31, 2026 (Form 8-K, exhibit 99.1)IREN LimitedMay 7, 2026
  6. Earnings release for the quarter ended December 31, 2025 (Form 8-K, exhibit 99.1)IREN LimitedFeb 5, 2026
  7. Earnings release for the quarter ended September 30, 2025 (Form 8-K, exhibit 99.1)IREN LimitedNov 6, 2025
  8. Release on the Microsoft AI Cloud contract (Form 8-K, exhibit 99.1)IREN LimitedNov 3, 2025
  9. Release on new AI Cloud contracts and the ARR target (Form 8-K, exhibit 99.1)IREN LimitedJul 20, 2026
  10. Release on the delivery of Horizon 1 (Form 8-K, exhibit 99.1)IREN LimitedAug 13, 2026
  11. Proxy statement for the 2026 annual general meeting (DEF 14A)IREN LimitedOct 13, 2026
  12. Form 4, Daniel Roberts, option sales of September 3 and 4, 2025SEC EDGARSep 5, 2025
  13. Form 4, Daniel Roberts, share sale of September 11, 2025SEC EDGARSep 11, 2025
  14. Form 4, William Roberts, share sale of September 11, 2025SEC EDGARSep 11, 2025
  15. IREN sinks 9% after report links it to Microsoft's AI spending delay https://247wallst.com/investing/2026/11/05/iren-sinks-9-after-report-links-it-to-microsofts-ai-spending-delay-nebius-tumbles-11-coreweave-slides-7/24/7 Wall St.Nov 5, 2026
  16. IREN drops 4% as SemiAnalysis flags its Canadian data centers https://247wallst.com/investing/2026/10/08/iren-drops-4-as-semianalysis-flags-its-canadian-data-centers-core-scientific-pulls-back-2/24/7 Wall St.Oct 8, 2026
  17. Neocloud stocks and Elon Musk's comment on consolidation https://www.cnbc.com/2026/10/26/neocloud-stocks-today-coreweave-nebius-iren-elon-musk.htmlCNBCOct 26, 2026
  18. The question everyone in AI is asking: How long before a GPU depreciates? https://www.cnbc.com/2025/11/14/ai-gpu-depreciation-coreweave-nvidia-michael-burry.htmlCNBCNov 14, 2025
  19. Under Hinojosa, Texas data center approvals could stay paused https://www.texastribune.org/2026/11/04/data-center-texas-pause-gina-hinojosa-governor-policies/The Texas TribuneNov 4, 2026
  20. GPUaaS revenue will reach USD130 billion by 2030 (GPU-as-a-service worldwide forecast 2025-2030) https://www.analysysmason.com/research/content/articles/gpuaas-forecast-overview-rma16/Analysys Mason

General research and analysis by Moatsight, not personalized investment advice. We show, you decide. Disclaimers