Moatsight viewPart 4 of 5 · 16 min read

Valuation and projections

Loud claims, checked: 2 partly supported · 1 supported · 3 open
VerdictClaimWho and when
Partly supportedThe delay is documented in the 10-Q; how much of Microsoft's spending gap came from IREN is not shownDelays at IREN's Childress site led Microsoft to spend about $5 billion less on capex than planned in its September quarterIn What changedThe Information, November 4, 2026, citing unnamed sources
OpenThe filings neither confirm nor refute the customer accountsCustomers have had extended power outages, network disruption and storage failures at the British Columbia sitesIn What changedSemiAnalysis, October 2026
Partly supportedGrowth is paced by funding; the contracted programme is funded on the company's figuresTighter credit will force most GPU clouds into failure or consolidationIn What changedElon Musk, post on X, October 25, 2026
SupportedFor the data centers only; IREN has $10.0 billion of debt principalIREN's data centers were paid for in cash and carry no debtIn What changedCo-CEO Daniel Roberts, November 5, 2026 earnings call
OpenIREN was not named; its five-year life has held so far in a tight marketAI chips earn for two to three years, so five- and six-year depreciation lives overstate profitsIn What changedMichael Burry, about large cloud companies, as reported by CNBC on November 14, 2025
OpenWhether a pause reaches approvals already granted is not knownA new Texas governor will pause data center approvalsIn What changedGovernor-elect Gina Hinojosa, as reported by The Texas Tribune on November 4, 2026

A verdict is the Moatsight view of what the filings show, not a finding of fact.

The core

We value IREN with a discounted cash flow on free cash flow after stock-based pay, built block by block of capacity. Each megawatt of the business needs a building, a set of GPUs and a contract, and new GPUs every five or six years. On our assumptions the shares are worth $0 in the Bear scenario, $17.67 in the Base scenario and $125.92 in the Bull scenario, with probabilities of 25%, 60% and 15%. The probability-weighted value is $29.49 per IREN share (Moatsight est.).

The range is extreme for two reasons:

  • The equity sits on top of $4.4 billion of net debt and $2.5 billion of prepayments already received.
  • At the September quarter's contract prices, with half the GPU cost prepaid, each megawatt earns little more than its cost of capital once tax, overhead and stock-based pay are counted. Contracts like the one signed after the quarter, at about $22 million with 90% of the GPU capex prepaid, earn clearly more.

Two dials decide the value: the revenue new contracts bring per megawatt, and what it costs to replace the GPUs once the first contract ends. Almost two thirds of the weighted value comes from the Bull scenario. In the Base, the explicit ten years consume cash, and all of the value lies in the years after them.

Method and why it fits

A multiple of EBITDA flatters this business. IREN's AI Cloud margin before depreciation is 86%, but the GPUs that earn it are used up within a contract or two and must be bought again. In our Base steady state, about 21% of EBITDA is left as free cash flow after replacing GPUs, growing slowly, paying tax and paying staff in shares (Moatsight est.). A DCF that charges every dollar of GPU spending, at the time it is spent, is the honest method.

The model runs quarterly from October 2026 to June 2036, then takes a terminal value. It works like this:

  • Capacity. Each scenario sets the IT megawatts in operation at each fiscal year end.
    • The first 300 MW are the programme behind the more than $4 billion ARR target. They earn $13.3 million per megawatt a year on five-year terms. That is the target ARR divided by 300 MW, a mix of Microsoft at about $9.7 million and the newer contracts.
    • Capacity beyond the programme earns the scenario's price for new contracts.
  • Life of a block.
    • After its first contract, a block runs a tail period on its old GPUs at a fraction of the first price.
    • It then gets new GPUs at the scenario's cost and a new contract at the scenario's refresh price.
    • Depreciation follows IREN's policy: GPUs over five years, buildings over twenty.
  • Costs.
    • AI Cloud cost of revenue is 14% of revenue, as in the latest quarter.
    • Corporate and site cash costs start at about $173 million a quarter, in line with the guided December-quarter increase. They grow at 4% a quarter until mid-2028 in the Base (2% in the Bear, 4.5% in the Bull), because management expects headcount to grow in fiscal 2027 about as fast as in fiscal 2026, when it nearly tripled (August 27, 2026 call). After that they grow at the scenario's rate.
    • Stock-based pay is about $110 million a quarter for two years, then a share of revenue.
  • Capital spending.
    • From October 2026 to June 2027 we take the company's plan of about $15 billion in the Base and Bull scenarios, and $10 billion in the Bear scenario.
    • In the Base, $4 billion of that spending is for assets the Base path needs only in fiscal 2028; management expects $25 billion of data center and GPU assets by June 2027 (November 5, 2026 call), more than the Base's capacity path uses by then, so we credit it against fiscal 2028 spending.
    • After that, a data center is paid for a year before its GPUs, at $14 million to $16 million per megawatt. GPUs are paid when installed, at $38 million to $40 million per megawatt.
    • Management's own illustration is about $60 million in all (November 5, 2026 call).
  • Prepayments. New contracts bring prepayments of 30% to 60% of the GPU cost. They are received when the GPUs are bought and earned over the contract.
  • Tax.
    • 25% on operating profit, which lies between the US federal rate and the Canadian and Australian rates of the entities that bill customers.
    • Losses are carried forward and offset up to 80% of later profit, starting from the $1,731.7 million of operating losses carried forward at June 30, 2026 (10-K). Losses are pooled across countries, which is generous to IREN.
    • Stock-based pay is treated as almost wholly non-deductible, as the 10-K's tax reconciliation shows.
  • From enterprise to equity value.
    • We deduct net debt of $4,430 million and the $2,544 million of deferred revenue at September 30, 2026, taken at its present value of about $1,833 million because most of it is credited against fees only after month 24. The deferred revenue is cash already received for revenue the model still counts. Prepayments that the model receives in its last years but that are still unearned in June 2036 are deducted too.
    • We add the October 2026 share sales, about $620 million net.
    • We treat the two in-the-money convertible series ($445 million, convertible at $13.64 and $16.81) as shares.
    • We divide by 449.1 million shares: 424.4 million outstanding on October 30, 2026, plus 29.7 million from those two convertibles and 9.6 million vested share units, less 14.5 million shares that IREN has already paid for under its prepaid forwards and that will be returned to it.
    • Unvested share units are left out of the count because their cost is already charged as stock-based pay.
    • Options (average exercise price $71.80), NVIDIA's rights at $70 and the higher convertibles count only in a scenario whose value is above their price.
    • Future share sales are assumed at the scenario's own value, so they do not move it. Sales below that value would dilute.

Cost of capital: 10% in every scenario. We build it from four inputs:

  • A cost of equity of about 14%: a risk-free rate of about 4.5%, an equity risk premium of 5% and a beta near 1.9 for a leveraged, young, single-industry business.
  • A pre-tax cost of new debt of about 8%. That lies between the 7.1% to 7.2% effective rates of the Microsoft-linked GPU loans and the 10.4% to 10.7% of the others, and is about 6% after tax.
  • Weights of about half debt and half equity, which fits a business that finances most of its GPUs with debt.
  • The result rounds to 10%.

We do not lower it for the investment-grade customers. Two thirds of the backlog is investment grade, but the GPUs' value after the contract is not. Nor do we raise it for the costlier recent loans, because the Bear scenario already carries the bad path.

The scenarios

DriverBear (Scenario)Base (Scenario)Bull (Scenario)
Operating IT MW at June 2028, June 2031, June 2036450, 600, 600600, 1,300, 1,750950, 1,950, 2,500
Revenue per MW a year on new contracts, USD million161921
Share of ARR recognised as revenue90%95%97%
First contract; tail on old GPUs after it4 years; 1 year at 35%5 years; 1 year at 45%5 years; 2 years at 50%
On refresh: revenue per MW a year, GPU cost per MW, USD million14; 3016; 3418; 32
New capacity: data center and GPU cost per MW, USD million16 and 4015 and 3814 and 38
Prepayments, share of GPU cost30%50%60%
Corporate and site cash costs, growth a quarter2.0% to mid-2028, then 1.0%, cut to 8% of revenue from fiscal 20314.0% to mid-2028, then 2.0%4.5% to mid-2028, then 2.5%
Capital spending, October 2026 to June 2027, USD billion1015, of which 4 credited against fiscal 202815
Terminal growth1.0%2.5%3.0%
Probability25%60%15%
Value per IREN share, USD017.67125.92
Source: Moatsight calculations; capacity, pricing and cost inputs set against the Form 10-Q for the quarter ended September 30, 2026, the earnings release of November 5, 2026 and the November 5, 2026 earnings call.

Bear: prices fall back and growth stops.

  • New contracts are signed at $16 million per megawatt, and four-year terms become the norm.
  • The second contract on a refreshed block pays $14 million, against $30 million of new GPUs.
  • IREN finishes what it has committed, about 450 MW by June 2028 and 600 MW by June 2030, and builds no more. Corporate costs are cut back.

On these numbers the business never earns back the capital already committed. The enterprise value is about minus $4.7 billion, about $11.6 billion short of net debt and prepayments received (Moatsight est.). The loss is in the first build, not in replacing GPUs. The present value of the ten explicit years is minus $7.0 billion: about $10 billion is spent by June 2027 on capacity let at the programme's prices and at $16 million, below the break-even after costs, while corporate costs are still growing. The terminal value, where blocks are refreshed, is positive. On the Bear's own refresh terms, a refreshed megawatt still earns about $2.1 million above the cost of its GPUs after overhead and tax (Moatsight est.), so the scenario does not assume that IREN keeps replacing GPUs at a loss. Shareholders cannot lose more than their shares, so we show the scenario at nil. In practice the shares would keep some option value, because most of the debt is low-coupon convertibles that do not mature until 2029 to 2033. On these assumptions that value would rest on prices recovering.

Base: today's pricing holds, and the GPUs earn a short tail.

  • New contracts are signed at $19 million per megawatt. That lies between the about $17 million of the five-year contracts and the $19 million to $23 million of the three-year contracts the CFO cited for the September quarter. It is below the $22 million five-year contract signed after it.
  • IREN reaches 600 MW by June 2028, short of its target of 0.8 GW by December 2027. It reaches 1.75 GW by 2036 on power it has already secured.
  • Free cash flow after stock-based pay is minus $13.8 billion in the rest of fiscal 2027 and turns positive in fiscal 2030 (Moatsight est.).

Bull: management's plan on time, prices firm.

  • IREN reaches 0.8 GW by the end of calendar 2027, its stated target, and 2.5 GW by 2036.
  • New contracts bring $21 million per megawatt, GPUs keep earning for two years after their first contract, and refreshed blocks bring $18 million.
  • At the scenario's value, the 2031 to 2033 convertibles convert, and NVIDIA buys its 30 million shares at $70.

This scenario reaches the company's own target; IREN has given none beyond it. Its weakness is money. It needs about $27.5 billion of capital spending in fiscal 2028 (Scenario), a year after management cut its fiscal 2027 plan "purely and simply" because of financial markets. That is why we give it 15%.

Shocks. A sharp fall in AI spending or a credit squeeze is not a fourth scenario: it is what the Bear scenario's prices describe. What none of the scenarios model is a forced share sale at a low price. The plan needs about $6 billion that is not yet funded, so a forced sale is the most direct way a shock would reach the value per share.

The value in numbers

Item, USD million unless statedBear (Scenario)Base (Scenario)Bull (Scenario)
Present value of free cash flow, October 2026 to June 2036−6,998−6,19213,499
Present value of the terminal value2,34420,72454,744
Enterprise value, after unearned prepayments at June 2036−4,65413,13466,364
Equity value−9,8527,93673,241
Shares, million449.1449.1581.6
Value per IREN share, USD017.67125.92
Source: Moatsight calculations.

The probability-weighted value is $29.49 per IREN share (Moatsight est.): 25% of nil, 60% of $17.67 and 15% of $125.92. The Bull scenario alone contributes $18.89 of it. The weighted value is high because the outcomes are lopsided; it is not the value of a typical outcome. In the Bull scenario, equity exceeds enterprise value because the converted notes are no longer debt and the capped calls and NVIDIA's purchase bring in cash. The share count rises with them.

How to read this: In the Base scenario the present value of the terminal value is 158% of the enterprise value, because the free cash flow of the first ten years is negative in total. The whole Base value rests on what a 1.75 GW AI cloud earns after 2036. That is a weakness of the business as much as of the method: a company that must spend about $60 million a megawatt before it earns anything has its value far in the future.

Sensitivity

Value per IREN share, USD (Base scenario); revenue per MW on new contracts down, cost of capital across9%10%11%
USD 17 million19.897.510
USD 19 million30.5617.678.04
USD 21 million41.2227.8317.71
Source: Moatsight calculations.
Value per IREN share, USD (Base scenario); revenue per MW on refresh down, GPU cost per MW on refresh acrossUSD 28 millionUSD 34 millionUSD 40 million
USD 13 million5.3700
USD 16 million43.0017.670
USD 19 million79.8855.3029.97
Source: Moatsight calculations.

The second table matters more than the first. Suppose the second generation of GPUs costs $34 million per megawatt. If the market then pays $13 million a year for a refreshed megawatt, the Base value is nil; at $19 million it is $55.30 (Scenario). Nobody knows the rents for 2031. That is the honest uncertainty in valuing a GPU cloud, and it is why the scenarios are so far apart.

Cross-check: what one megawatt is worth

The second method values one megawatt on its own, with nothing about the size of IREN's plan. We take management's illustration from the November 5, 2026 call:

  • $60 million of capex, one third data center and two thirds GPUs;
  • a five-year contract at $20 million a year;
  • half the GPU cost prepaid;
  • an 85% project margin, the figure the CFO gave for the Microsoft contract on the November 6, 2025 call.

To that we add zero value for the GPUs after the contract. We also add the building, let afterwards at the $130 per kW per month that management uses as its internal data center charge.

Case, at a 10% cost of capitalResult (Moatsight est.)
Value above cost, before tax and overhead$13.5 million
Value above cost, if the GPUs keep a fifth of their value$18.5 million
Break-even revenue per MW, before tax and overheadabout $15.8 million a year
Break-even revenue per MW, after stock-based pay, a share of overhead and 25% taxabout $20.2 million a year
Value above cost after those costs, at $20 million a yearabout nil
Value above cost after those costs, at $22 million a year$3.9 million
Microsoft contract, at about $9.7 million per MW, before tax and overhead$5.6 million below cost
Break-even revenue per MW after those costs, if the GPUs earn one more year at 45% of the price, as in the Base scenarioabout $19.2 million a year
Value above cost after those costs, at $22 million a year with 90% of the GPU cost prepaid$7.7 million
The same, if the GPUs earn one more year at 45% of the price$10.4 million
Break-even revenue per MW after those costs, with 90% of the GPU cost prepaidabout $18.4 million a year
Source: Moatsight calculations; inputs from the November 5, 2026 and November 6, 2025 earnings calls.

The cross-check agrees with the scenarios. The $20.2 million break-even after costs is a cautious line: it gives the GPUs no value once the first contract ends. If they earn one more year at 45% of the price, as the Base scenario assumes, the line falls to about $19.2 million; a large prepayment lowers it further, to about $18.4 million with 90% of the GPU cost prepaid (Moatsight est.). On these figures the five-year contract signed after the quarter, at about $22 million per megawatt with 90% of the GPU capex prepaid (earnings release of November 5, 2026), is worth about $7.7 million per megawatt above its cost after overhead and tax, or $10.4 million with the Base scenario's extra year (Moatsight est.): clearly value-creating, not a break-even contract. On the illustration's $60 million of capex, contracts in the high teens with half the GPU cost prepaid roughly earn their cost and little more. The Base scenario builds new capacity for less, $15 million of data center and $38 million of GPUs per megawatt: on that capex and with its extra year, $19 million a year earns about $5.7 million per megawatt above cost after overhead and tax, and the break-even is about $16.6 million (Moatsight est.). Corporate costs growing ahead of capacity and the weaker first programme absorb much of that in the scenario. The figures for the new contract use the illustration's $40 million of GPUs per megawatt, as its GPU cost is not disclosed; at $46 million, 15% more, it would be worth about $4.2 million above cost (Moatsight est.).

Translated into multiples:

  • The Base enterprise value is 1.0 times the scenario's fiscal 2030 EBITDA.
  • The terminal value is about 2.7 times the steady-state EBITDA.

Both are low because the tenant does not pay for the computers here; IREN does, again and again.

What today's price implies

The shares traded at about $21 in early November 2026. They fell sharply on November 5, after The Information's report about the Microsoft delay and on a day when other GPU-cloud shares also fell sharply, a sell-off that 24/7 Wall St. (November 5, 2026) tied in part to the election results. They rose the next day after the results. On our Base assumptions, about $21 a share corresponds to new contracts at about $19.7 million per megawatt (Moatsight est.). That is a little above the $19 million we assume, in the range of the three-year contracts of the September quarter, and below the $22 million five-year contract signed after it.

The price therefore implies that IREN keeps signing contracts at about today's prices, and that the refresh question resolves roughly as our Base assumes. It gives the Bull scenario's growth some, but limited, weight. The Bear scenario's nil comes from its assumptions taken together, not from the price of new contracts alone: $16 million on four-year terms, $14 million on refreshed blocks, growth stopping at 600 MW and $10 billion of spending to June 2027. A lower price on its own does less: in the Base scenario, new contracts at $17 million per megawatt give $7.51 per IREN share (Scenario).

The next four quarters and the years after

Base scenario, USD million unless statedQ2 FY27Q3 FY27Q4 FY27Q1 FY28
Revenue (Scenario)2625339091,196
Net income (Scenario)−314−350−306−225
Capital spending (Scenario)5,0005,0005,0001,859
Free cash flow (Scenario)−5,002−4,814−4,012−334
Source: Moatsight calculations.

Over the four quarters to Q1 fiscal 2028, Moatsight estimates:

MeasureMoatsight est., four quarters to Q1 FY28Twelve months to September 30, 2026
Revenue$2,900 million$694.7 million
Diluted EPS, US GAAPminus $2.58 per shareminus $3.39
Free cash flowminus $14,162 millionminus $6,389.6 million
Source: Moatsight calculations.

Free cash flow here is operating cash flow less all capital spending, including GPUs. The December quarter follows the CFO's guide: a quarter of the $1 billion of operating ARR, plus the last bitcoin revenue. Revenue then ramps as Horizons 2 to 4 and Mackenzie are accepted from January. The loss narrows because depreciation, interest and corporate costs grow more slowly than revenue. The free cash flow includes about $1.5 billion of new customer prepayments, most of it in the June and September 2027 quarters, and the September 2027 quarter is the first to benefit from the fiscal 2028 credit described above (Moatsight est.).

For the four years after that, the Base path continues on the same assumptions, with 600 MW in operation by June 2028 and 1.3 GW by June 2031 (Moatsight est.):

  • Margins. Net income rises from 0.9% of revenue in the four quarters to Q1 fiscal 2029 to 13.3%, 14.2% and 16.8% in the three periods after. More blocks run past their peak depreciation, and losses carried forward shelter part of the profit.
  • Share count. The weighted average count rises from about 464 million in the next four quarters to about 582 million. The model funds 70% of each quarter's cash shortfall, after cash and committed loans, with debt, and the rest with shares sold at the Base value of $17.67. The count stays near 582 million once free cash flow turns positive in fiscal 2030.

What the model leaves out

  • Land and power beyond the plan. IREN says it has secured more than 5 GW of power; the Base scenario's 1.75 GW of IT load needs about 2.3 GW of it, which leaves about 2.7 GW. Unused connections could be sold or leased as powered sites. IREN's own purchases put connection rights at about $0.07 million per megawatt in Oklahoma and about $0.5 million in Spain; on that range the unused power would be worth about $0.4 to $3 per share (Moatsight est., rough).
  • The price of future share sales. The model assumes shares are sold at the scenario's value. In the Base path about 157 million more shares are sold by fiscal 2031. If they went at half the Base value, the value per share would be about a fifth lower (Moatsight est., rough).
  • Contract terms we cannot see. These include the delay credits and fees still under discussion with Microsoft, NVIDIA's contract terms, and the size of the frontier-lab contract.
  • Texas. The Texas sites hold 2,750 MW, 49.0% of the 5,610 MW of gross power in the sites table of the Business explainer tab, and 95.5% of the gross power at sites operating or under construction (we calculate). The governor-elect's pledged pause on data center approvals could delay Sweetwater, and so could the state audit of data centers in the connection queue, which The Texas Tribune reported on November 4, 2026 was expected to last until December (What changed tab). The Base scenario assumes no delay from either, and we have not put a number on one.
  • Interest. The DCF values the business before financing. The equity value deducts today's net debt, and the cost of future debt is in the cost of capital, not in the cash flows.

Scenarios

ScenarioValue per shareProbabilityHorizonMethod and drivers
Bear$0.00ScenarioOne of Moatsight's scenarios, not a forecast or a price target25.0%ScenarioOne of Moatsight's scenarios, not a forecast or a price target10 yearsQuarterly capacity-cohort DCF on free cash flow after stock-based pay, 10% cost of capital, terminal growth 1.0%
  • New contracts at USD 16 million per MW a year, four-year terms, one year at 35% of the price on old GPUs after the term
  • Refreshed capacity earns USD 14 million per MW a year against USD 30 million per MW of new GPUs
  • Growth stops at committed capacity: 450 MW (IT) by June 2028, 600 MW from June 2030
  • Capital spending of USD 10 billion from October 2026 to June 2027; corporate costs cut to 8% of revenue from fiscal 2031
  • Enterprise value about USD 11.6 billion short of net debt and prepayments received; shown at nil
10 yearsQuarterly capacity-cohort DCF on free cash flow after stock-based pay, 10% cost of capital, terminal growth 1.0%
  • New contracts at USD 16 million per MW a year, four-year terms, one year at 35% of the price on old GPUs after the term
  • Refreshed capacity earns USD 14 million per MW a year against USD 30 million per MW of new GPUs
  • Growth stops at committed capacity: 450 MW (IT) by June 2028, 600 MW from June 2030
  • Capital spending of USD 10 billion from October 2026 to June 2027; corporate costs cut to 8% of revenue from fiscal 2031
  • Enterprise value about USD 11.6 billion short of net debt and prepayments received; shown at nil
Base$17.67ScenarioOne of Moatsight's scenarios, not a forecast or a price target60.0%ScenarioOne of Moatsight's scenarios, not a forecast or a price target10 yearsQuarterly capacity-cohort DCF on free cash flow after stock-based pay, 10% cost of capital, terminal growth 2.5%
  • New contracts at USD 19 million per MW a year on five-year terms, one year at 45% of the price after the term
  • Refreshed capacity earns USD 16 million per MW a year against USD 34 million per MW of new GPUs
  • 600 MW (IT) in operation by June 2028, 1.3 GW by June 2031, 1.75 GW by June 2036
  • Capital spending of USD 15 billion from October 2026 to June 2027, as the company plans, USD 4 billion of it credited against fiscal 2028; prepayments of 50% of GPU cost
  • Free cash flow after stock-based pay turns positive in fiscal 2030
  • Corporate and site cash costs grow 4.0% a quarter to mid-2028, then 2.0%; 25% tax with losses carried forward
10 yearsQuarterly capacity-cohort DCF on free cash flow after stock-based pay, 10% cost of capital, terminal growth 2.5%
  • New contracts at USD 19 million per MW a year on five-year terms, one year at 45% of the price after the term
  • Refreshed capacity earns USD 16 million per MW a year against USD 34 million per MW of new GPUs
  • 600 MW (IT) in operation by June 2028, 1.3 GW by June 2031, 1.75 GW by June 2036
  • Capital spending of USD 15 billion from October 2026 to June 2027, as the company plans, USD 4 billion of it credited against fiscal 2028; prepayments of 50% of GPU cost
  • Free cash flow after stock-based pay turns positive in fiscal 2030
  • Corporate and site cash costs grow 4.0% a quarter to mid-2028, then 2.0%; 25% tax with losses carried forward
Bull$125.92ScenarioOne of Moatsight's scenarios, not a forecast or a price target15.0%ScenarioOne of Moatsight's scenarios, not a forecast or a price target10 yearsQuarterly capacity-cohort DCF on free cash flow after stock-based pay, 10% cost of capital, terminal growth 3.0%
  • Management's 0.8 GW target reached by December 2027; 2.5 GW (IT) by June 2036
  • New contracts at USD 21 million per MW a year, two years at 50% of the price on old GPUs after the term
  • Refreshed capacity earns USD 18 million per MW a year against USD 32 million per MW of new GPUs
  • Prepayments of 60% of GPU cost; 2031 to 2033 convertibles convert and NVIDIA buys 30 million shares at USD 70
  • Needs about USD 27.5 billion of capital spending in fiscal 2028
10 yearsQuarterly capacity-cohort DCF on free cash flow after stock-based pay, 10% cost of capital, terminal growth 3.0%
  • Management's 0.8 GW target reached by December 2027; 2.5 GW (IT) by June 2036
  • New contracts at USD 21 million per MW a year, two years at 50% of the price on old GPUs after the term
  • Refreshed capacity earns USD 18 million per MW a year against USD 32 million per MW of new GPUs
  • Prepayments of 60% of GPU cost; 2031 to 2033 convertibles convert and NVIDIA buys 30 million shares at USD 70
  • Needs about USD 27.5 billion of capital spending in fiscal 2028

As of Nov 8, 2026 · Moatsight estimates

Next twelve months

Moatsight est.ValueGrowth
Revenue$2.9BMoatsight est.Moatsight's own estimate, not a reported figure317.0%Moatsight est.Moatsight's own estimate, not a reported figure
Diluted EPS per ordinary share−$2.58Moatsight est.Moatsight's own estimate, not a reported figure
Free cash flow−$14.2BMoatsight est.Moatsight's own estimate, not a reported figure

As of Nov 8, 2026 · Moatsight estimates

Next five years

Moatsight est.RevenueDiluted EPS per ordinary share
To Q1 FY 2028$2.9BMoatsight est.Moatsight's own estimate, not a reported figure−$2.58Moatsight est.Moatsight's own estimate, not a reported figure
To Q1 FY 2029$7.9BMoatsight est.Moatsight's own estimate, not a reported figure$0.13Moatsight est.Moatsight's own estimate, not a reported figure
To Q1 FY 2030$12.6BMoatsight est.Moatsight's own estimate, not a reported figure$2.93Moatsight est.Moatsight's own estimate, not a reported figure
To Q1 FY 2031$17.1BMoatsight est.Moatsight's own estimate, not a reported figure$4.18Moatsight est.Moatsight's own estimate, not a reported figure
To Q1 FY 2032$20.4BMoatsight est.Moatsight's own estimate, not a reported figure$5.91Moatsight est.Moatsight's own estimate, not a reported figure

As of Nov 8, 2026 · Moatsight estimates

Sources

  1. Earnings release for the quarter ended September 30, 2026 (Form 8-K, exhibit 99.1)IREN LimitedNov 5, 2026
  2. Form 10-Q for the quarter ended September 30, 2026IREN LimitedNov 5, 2026
  3. Form 10-K for the year ended June 30, 2026IREN LimitedAug 27, 2026
  4. Earnings release for fiscal 2026 (Form 8-K, exhibit 99.1)IREN LimitedAug 27, 2026
  5. Earnings release for the quarter ended March 31, 2026 (Form 8-K, exhibit 99.1)IREN LimitedMay 7, 2026
  6. Earnings release for the quarter ended December 31, 2025 (Form 8-K, exhibit 99.1)IREN LimitedFeb 5, 2026
  7. Earnings release for the quarter ended September 30, 2025 (Form 8-K, exhibit 99.1)IREN LimitedNov 6, 2025
  8. Release on the Microsoft AI Cloud contract (Form 8-K, exhibit 99.1)IREN LimitedNov 3, 2025
  9. Release on new AI Cloud contracts and the ARR target (Form 8-K, exhibit 99.1)IREN LimitedJul 20, 2026
  10. Release on the delivery of Horizon 1 (Form 8-K, exhibit 99.1)IREN LimitedAug 13, 2026
  11. Proxy statement for the 2026 annual general meeting (DEF 14A)IREN LimitedOct 13, 2026
  12. Form 4, Daniel Roberts, option sales of September 3 and 4, 2025SEC EDGARSep 5, 2025
  13. Form 4, Daniel Roberts, share sale of September 11, 2025SEC EDGARSep 11, 2025
  14. Form 4, William Roberts, share sale of September 11, 2025SEC EDGARSep 11, 2025
  15. IREN sinks 9% after report links it to Microsoft's AI spending delay https://247wallst.com/investing/2026/11/05/iren-sinks-9-after-report-links-it-to-microsofts-ai-spending-delay-nebius-tumbles-11-coreweave-slides-7/24/7 Wall St.Nov 5, 2026
  16. IREN drops 4% as SemiAnalysis flags its Canadian data centers https://247wallst.com/investing/2026/10/08/iren-drops-4-as-semianalysis-flags-its-canadian-data-centers-core-scientific-pulls-back-2/24/7 Wall St.Oct 8, 2026
  17. Neocloud stocks and Elon Musk's comment on consolidation https://www.cnbc.com/2026/10/26/neocloud-stocks-today-coreweave-nebius-iren-elon-musk.htmlCNBCOct 26, 2026
  18. The question everyone in AI is asking: How long before a GPU depreciates? https://www.cnbc.com/2025/11/14/ai-gpu-depreciation-coreweave-nvidia-michael-burry.htmlCNBCNov 14, 2025
  19. Under Hinojosa, Texas data center approvals could stay paused https://www.texastribune.org/2026/11/04/data-center-texas-pause-gina-hinojosa-governor-policies/The Texas TribuneNov 4, 2026
  20. GPUaaS revenue will reach USD130 billion by 2030 (GPU-as-a-service worldwide forecast 2025-2030) https://www.analysysmason.com/research/content/articles/gpuaas-forecast-overview-rma16/Analysys Mason